1 or 2 cages
Rated loading: 2000Kg/Cage
Rated lifting speed: 33M/Minuite
Lifting height: 50M
Max height: 150M
Carrage dimension: 3x1.3x2.5M
Notes:
1. Every rolling parts, jointing parts, machinery plate, etc. All treated with zinc plated;
2. All structure done with sand blasting, this make the paint absorption stronger.
| Serial No. | Parts name | Technical parameter | No. | Configuration and technical specification | |
| 1 | Machinery frame | 2×3×11kw | 2 sets | Motor: YZEJ132M−4 (Shanghai or Qidong) Worm gear: A=125 ; I=16 (Tianjin) | |
| 2 | Safety machanism | Governor tripping speed 1.0m/s | 2 sets | Safety device: SAJ40−1 . 2 (Shanghai or Kunshan) | |
| 3 | Cage | 3 . 0×1 . 3×2 . 5m | 2 pieces | Punched aluminum alloy wall, bearing beam with varing section and launder design on top of the cage, not only strengthen the cage fit, but also beautify the cage shape. | |
| 4 | Mast section | 650×650×1508mm | 50 pieces | Solid drawn tube: 20# fine steel casting iron. Rack: fine hub steel (LG60) | |
| 5 | Enclosure | 5100×3400mm | 1 sets | Removable disc structure, easy to deliver. | |
| 6 | Tie-in | Standard 2 type (direct tie-in) | 8 sets | Every 9m to install one set, very easy to dismounting. | |
| 7 | Cable system | Cable trolley | 2 sets | ||
| 8 | Cable | YC : 3×25+2×10 | 2×90m | Using national standard hoisting hand cable, meets requirements of the hoisting strength and calorific intensity. | |
| 9 | Electrical steeve | 380V , 300/600kg | 1 sets | Single rope using can carry 300kg; double rope using can carry 600kg, three phase machine can be used frequently. | |
| 10 | Drop test device | 1 sets | Drop test using, plug directly, very convenient. | ||
| 11 | Controller on the top of the cage | 2 sets | Using for install and dismantle; top of the cage priority control. | ||
12 | Main components of the electrical controling system | AC contactor | LC1-D8011M5 | 2 pieces | Schneider TE |
| AC contactor | LC1-D8011F7 | 6 pieces | Schneider TE | ||
| AC contactor | LC1-D1201F7 | 2 pieces | Schneider TE | ||
| Thermorelay | LR2-D3363C | 4 pieces | Schneider TE | ||
| Control transformer | BK-400VA | 2 pieces | Beijing transformer factory | ||
| Limit switch | 3LBB-115 | 2 pieces | Beijing machine tool electrical appliance factory | ||
| Transfer switch | 3LBB-115 | 2 pieces | Beijing machine tool electrical appliance factory | ||
| Travel switch | TZ-8104 | 8 pieces | Taiwan TEND | ||
| Travel switch | TZ-5104 | 4 pieces | Taiwan TEND | ||
| Miniature circuit breaker | 100A | 2 pieces | |||
| Phase sequence protector | XJ3-S | 2 pieces | |||
| Cross-switch | TMR-300 15A | 2 pieces | Taiwan TEND | ||
| Rectifier bridge | KBP 1000V/20A | 2 pieces | Taiwan | ||
| Kinds of button | / | / | IDEC | ||